Reinforced Main Beam for Al Fula Bridge

This project was done by specialized group from TOLAN factory; the process of strengthening includes several steps.

  • Assembly of the main reinforcement plates for the beam at the site
  • The Reinforcement includes two main plates with holes at the top and bottom
  • Hold the two plates in position and drilling the previous holes in the concrete beam and insert the bolts through the main beam
  • Tightening the bolts.
Related projects